# Grants for planting new forests and industrial tree plantations (KAP-RD38-RD39-1-25)

Source: https://palyazatok.iz-labs.com/en/calls/kap-rd38-rd39-1-25
Official page: https://kap.gov.hu/tamogatas/kap-rd38-rd39-1-25
Status: Closed

Original title: Erdőtelepítés és fásítás támogatása

Non-refundable flat-rate grant per hectare for planting forest or industrial acacia or poplar plantations, plus yearly upkeep and compensation for lost farm income. Only the landowner, or someone with the owner's consent, can apply, and forests need an approved afforestation plan.

## Key facts

- Amount: – (Non-refundable grant)
- Deadline: 4 November 2026
- Opens: 7 October 2026
- How to apply: Online only, after logging in with the government ID service (KAÜ) on the Hungarian State Treasury portal (www.mvh.allamkincstar.gov.hu); you must be registered in the KNYR beneficiary register.
- Total budget: HUF 64 billion
- Project duration: up to 24 months
- Submission windows: 2025-04-02 – 2025-05-09; 2026-01-06 – 2026-02-02; 2026-06-15 – 2026-07-15; 2026-10-07 – 2026-11-04; 2027-02-03 – 2027-03-03

## Who can apply?

- Company size: micro, small, medium, large companies
- Project location: Anywhere in Hungary
- Consortium: no

## Special conditions

- On the day you apply, you own the land or have the owner's consent to plant a forest or plantation on it. (2.1. section) [gate]
- For a forest you need an afforestation plan approved by the forestry authority; for an industrial plantation, the certificate under Government Decree 135/2017, §4(1). (2.1. section) [gate]
- You must be registered in the KNYR beneficiary register. (2.4. section) [gate]
- You must qualify as a 'transparent organisation' under the Public Finances Act; otherwise the application is rejected without a chance to fix it. (7.2. section) [gate]
- The planned forest block or plantation must be at least 0.5 hectares. (3.3.1. section) [gate]
- Do not start planting before you submit the application, or the area will be rejected. (4.1. section) [gate]
- Income-loss compensation is only paid if the land received basic income support (BISS) in the application year or the year before. (3.3.1. section)
- You need at least 30 of 100 points in the scoring (or the higher minimum set by the managing authority). (7.2. section)

## What it pays for

- Planting forest in four stand groups: oak, beech and other hardwoods; other softwoods and conifers; acacia (black locust); hybrid poplar.
- Industrial acacia or hybrid poplar plantations for raw material.
- Extras done together with planting: fencing, electric fence, terracing on slopes, forest edge, mycorrhizal seedlings, mixed stands, rare tree species.
- Yearly care of the new forest for 5–11 years, depending on the stand group.
- Compensation for lost farm income for 12 years (forests only).

## Not eligible

- State forestry companies cannot apply.
- Undertakings in difficulty, or anyone who has not complied with an EU order to repay state aid.
- Anyone fined by the nature conservation authority (final decision) in the application year or the year before.
- Anyone whose EAFRD forestry support was terminated for irregularity or breach of obligations in the previous two calendar years.
- Short-rotation energy plantations and Christmas tree farms are not eligible.
- Land mapped in MePAR as environmentally sensitive permanent grassland or wetland, and invasive species on or near protected or Natura 2000 areas.
- Replacement afforestation required as compensation, and 'free-disposal' forests.

## Frequently asked questions

**How much do I get per hectare?**

Forest planting pays EUR 2,299–3,920/ha in forints depending on stand type (+10% on slopes of 10° or more); industrial plantations EUR 2,233–2,329/ha. Forests also get yearly care (EUR 320–605/ha/yr) and income-loss compensation (EUR 432/ha/yr for 12 years).

**Do I need to account with invoices?**

No. It is a flat unit-cost grant, so you do not prove costs with invoices to get paid, though you must keep records under accounting rules. There is no advance payment.

**How long must I keep the forest or plantation?**

For forests, until the end of the care period, or 13 years if you take income-loss compensation. Industrial plantations cannot be harvested for at least 8 years and must be harvested by year 20.

**How long do I have to plant?**

Within 24 months from the day after the grant decision becomes final.

## Official documents

- [KAP-RD38-RD39-1-25 Erdőtelepítés és fásítás támogatása.pdf](https://kap.gov.hu/sites/default/files/2026-07/KAP-RD38-RD39-1-25%20Erd%C5%91telep%C3%ADt%C3%A9s%20%C3%A9s%20f%C3%A1s%C3%ADt%C3%A1s%20t%C3%A1mogat%C3%A1sa.pdf) (PDF, 883 kB)
- [1. melléklet - Fogalomtár_1.pdf](https://kap.gov.hu/sites/default/files/2025-03/1.%20mell%C3%A9klet%20-%20Fogalomt%C3%A1r_1.pdf) (PDF, 650 kB)
- [2. melléklet - Elsőkivitelre megállapított minimális csemeteszámok.pdf](https://kap.gov.hu/sites/default/files/2025-03/2.%20mell%C3%A9klet%20-%20Els%C5%91kivitelre%20meg%C3%A1llap%C3%ADtott%20minim%C3%A1lis%20csemetesz%C3%A1mok.pdf) (PDF, 557 kB)
- [3. melléklet - Kiegészítő intezkedések.pdf](https://kap.gov.hu/sites/default/files/2025-03/3.%20mell%C3%A9klet%20-%20Kieg%C3%A9sz%C3%ADt%C5%91%20intezked%C3%A9sek.pdf) (PDF, 902 kB)
- [4. melléklet - Célállománytípus csoportok meghatározása.pdf](https://kap.gov.hu/sites/default/files/2025-03/4.%20mell%C3%A9klet%20-%20C%C3%A9l%C3%A1llom%C3%A1nyt%C3%ADpus%20csoportok%20meghat%C3%A1roz%C3%A1sa.pdf) (PDF, 478 kB)
- [5. melléklet - Mikorrhizáltságát tanúsító bizonylat minta.docx](https://kap.gov.hu/sites/default/files/2025-03/5.%20mell%C3%A9klet%20-%20Mikorrhiz%C3%A1lts%C3%A1g%C3%A1t%20tan%C3%BAs%C3%ADt%C3%B3%20bizonylat%20minta.docx) (DOCX, 81 kB)
- [6. melléklet - Tartalmi értékelési szempontok.pdf](https://kap.gov.hu/sites/default/files/2025-03/6.%20mell%C3%A9klet%20-%20Tartalmi%20%C3%A9rt%C3%A9kel%C3%A9si%20szempontok.pdf) (PDF, 656 kB)
- [7. melléklet - Erdészeti döntéstámogató rendszer felhasználásával gener...pdf](https://kap.gov.hu/sites/default/files/2025-03/7.%20%20mell%C3%A9klet%20-%20Erd%C3%A9szeti%20d%C3%B6nt%C3%A9st%C3%A1mogat%C3%B3%20rendszer%20felhaszn%C3%A1l%C3%A1s%C3%A1val%20gener...pdf) (PDF, 455 kB)
- [8. melléklet - Arachne adatok.pdf](https://kap.gov.hu/sites/default/files/2025-03/8.%20mell%C3%A9klet%20-%20Arachne%20adatok.pdf) (PDF, 437 kB)

---
Conditions are extracted from the official call document, which always prevails. Last synced: 4 November 2026.
IZ Labs Kft. · https://palyazatok.iz-labs.com