# Grants to protect forests from fire, pests and disease (KAP-RD41-4-26)

Source: https://palyazatok.iz-labs.com/en/calls/kap-rd41-4-26
Official page: https://kap.gov.hu/tamogatas/kap-rd41-4-26
Status: Closed

Original title: Az erdőpotenciált veszélyeztető biotikus és abiotikus károk megelőzése

Non-refundable flat-rate grant for firebreaks, firefighting water points and ponds, pest and disease control, and clearing conifer brash and stump rows. Only registered forest managers can apply, for forest blocks with an approved forest plan.

## Key facts

- Amount: – (Non-refundable grant)
- Deadline: 11 November 2026
- Opens: 14 October 2026
- How to apply: Online only, after logging in with government e-ID on the Hungarian State Treasury portal (www.allamkincstar.gov.hu); you must be registered in the KNYR beneficiary register, and you can file one application per submission round.
- Total budget: HUF 3 billion
- Project duration: up to 24 months
- Submission windows: 2026-10-14 – 2026-11-11; 2027-03-03 – 2027-03-31; 2027-09-01 – 2027-09-29

## Who can apply?

- Company size: micro, small, medium, large companies
- Project location: Anywhere in Hungary

## Special conditions

- You are a forest manager registered by the forestry authority (final decision), and the forest block in your application has an approved forest plan. (2.1. section) [gate]
- You must be registered in the KNYR beneficiary register. (2.4. section) [gate]
- You must qualify as a 'transparent organisation' under the Public Finances Act; otherwise the application is rejected without a chance to fix it. (7.2. section) [gate]
- You must attach a forest damage prevention plan (annex 5); firebreaks and water points also need a fire protection plan under the forest fire decree. (3.3. section) [gate]
- Do not start the work before you submit the application, or the part already started will be rejected. (4.1. section) [gate]
- If you are not the only forest manager of all the protected forest area, you need the other managers' consent or agreement (annex 2). (13.1.2. section)
- You need at least 15 of 100 points in the scoring (or the higher minimum set by the managing authority). (7.2. section)

## What it pays for

- Building type A, B or C firebreaks and maintaining them for five years, or upgrading type A firebreaks.
- Building firefighting water points and seasonal water-retention ponds.
- Chemical control of powdery mildew when regenerating oak stands, for up to 3 more years.
- Cockchafer grub control on sandy soil: chemical application through irrigation pipes or a one-off soil treatment.
- Removing conifer brash from thinning in fire-prone conifer stands.
- Removing or grinding stump rows in high fire-risk stands after final felling.

## Not eligible

- Undertakings in difficulty, or anyone who has not complied with an EU order to repay state aid.
- Same area and activity already funded within five years under call KAP-RD41-1-24 or VP5-8.3.1-17.
- Forest blocks whose manager got a final nature conservation or forestry fine in the application year or the two years before and has not complied with it.
- Christmas tree and decorative greenery plots, short-rotation energy or industrial tree plantations, and 'free-disposal' forests.
- No activities other than those listed in section 3.1.1.

## Frequently asked questions

**How much can I get?**

Fixed unit rates per activity, set in euros and paid in forints: firebreaks EUR 0.1–0.5 per running metre per year, water points EUR 40,030–69,000 each, ponds EUR 40,030–60,230 each, conifer brash and stump rows EUR 25/m³ (stumps capped at EUR 915/ha).

**Do I need to account with invoices?**

No. It is a flat unit-cost grant, so you do not prove costs with invoices, though you must keep records under accounting rules. There is no advance payment.

**How long must I maintain what I built?**

For five years from your first payment claim. For firebreaks you file a payment claim every year in that period; around water points and ponds you cannot do final felling in the forest block.

**When must I do the work and claim payment?**

Within 24 months from the day after the grant decision becomes final (for multi-year activities, the first year's work), then claim payment by the next single application (EK) deadline.

## Official documents

- [KAP-RD41-4-26 Az erdőpotenciált veszélyeztető biotikus és abiotikus károk megelőzése.pdf](https://kap.gov.hu/sites/default/files/2026-09/KAP-RD41-4-26%20Az%20erd%C5%91potenci%C3%A1lt%20vesz%C3%A9lyeztet%C5%91%20biotikus%20%C3%A9s%20abiotikus%20k%C3%A1rok%20megel%C5%91z%C3%A9se.pdf) (PDF, 777 kB)
- [1. melléklet - Fogalomtár_0.pdf](https://kap.gov.hu/sites/default/files/2026-09/1.%20mell%C3%A9klet%20-%20Fogalomt%C3%A1r_0.pdf) (PDF, 493 kB)
- [2. melléklet - Hozzájáruló nyilatkozat.docx](https://kap.gov.hu/sites/default/files/2026-09/2.%20mell%C3%A9klet%20-%20Hozz%C3%A1j%C3%A1rul%C3%B3%20nyilatkozat.docx) (DOCX, 152 kB)
- [3. melléklet - Vegyszeres erdővédelmi napló.xlsx](https://kap.gov.hu/sites/default/files/2026-09/3.%20mell%C3%A9klet%20-%20Vegyszeres%20erd%C5%91v%C3%A9delmi%20napl%C3%B3.xlsx) (XLSX, 12 kB)
- [4. melléklet - Tartalmi értékelési szempontok (1).pdf](https://kap.gov.hu/sites/default/files/2026-10/4.%20mell%C3%A9klet%20-%20Tartalmi%20%C3%A9rt%C3%A9kel%C3%A9si%20szempontok%20%281%29.pdf) (PDF, 633 kB)
- [5. melléklet - Erdőkár megelőzési terv.pdf](https://kap.gov.hu/sites/default/files/2026-09/5.%20mell%C3%A9klet%20-%20Erd%C5%91k%C3%A1r%20megel%C5%91z%C3%A9si%20terv.pdf) (PDF, 321 kB)
- [6. melléklet - Arachne+ adatok.pdf](https://kap.gov.hu/sites/default/files/2026-09/6.%20mell%C3%A9klet%20-%20Arachne%2B%20adatok.pdf) (PDF, 291 kB)

---
Conditions are extracted from the official call document, which always prevails. Last synced: 11 November 2026.
IZ Labs Kft. · https://palyazatok.iz-labs.com